Difficulty

Easy

Steps

5

Time Required

                          15 minutes            

Sections

1

  • Hard Drive and SSD
  • 5 steps

Flags

0

  • BackMSI GT72 2QE Dominator Pro

  • Full Screen

  • Options

  • History

  • Save to Favorites

  • Download PDF

  • Edit

  • Translate

  • Get Shareable Link

  • Embed This Guide

  • Notify Me of Changes

  • Stop Notifications

Introduction

What you need

Step 1

              Hard Drive and SSD               
  • Remove the seven 6mm #0 Phillips Head screws on the bottom of the device.
  • Remove the bottom to access the inside.

Remove the seven 6mm #0 Phillips Head screws on the bottom of the device.

Remove the bottom to access the inside.

1024

Step 2

  • Disconnect the SATA cable from the hard drive.

Disconnect the SATA cable from the hard drive.

Step 3

  • Pull out the hard drive.

Pull out the hard drive.

Step 4

  • Remove the two 6mm #0 Phillips head screws securing the two SSDs.

Remove the two 6mm #0 Phillips head screws securing the two SSDs.

Step 5

  • Pull the SSDs away from its slot.
  • Be sure to pull parallel to the PCB. Do not pull upward at an angle.

Pull the SSDs away from its slot.

Be sure to pull parallel to the PCB. Do not pull upward at an angle.

To reassemble your device, follow these instructions in reverse order.

Cancel: I did not complete this guide.

                                                                                      2 other people completed this guide.                                             

Author

                                      with 1 other contributor 

                    Colin Harrop                     

Member since: 04/20/2017

164 Reputation

                                      1 Guide authored                  



                       Badges:
                       6







                                                        +3 more badges                           

Team

                       Cal Poly, Team S17-G2, Banghart Spring 2017                        

                                                  Member of Cal Poly, Team S17-G2, Banghart Spring 2017 



                    CPSU-BANGHART-S17S17G2                     


                                            5 Members                     


                                            7 Guides authored                     

rajh - Jul 2, 2019

Reply

Good evening how to get a laptop battery with shipping to Saudi Arabia